Pennsylvania Turnpike Reconstruction Mileposts 102-109 – Somerset, PA
This $117M project consisted of the reconstruction and widening of the Pennsylvania Turnpike from two lanes to three lanes in each direction from milepost 102 to milepost 109. Sauls Seismic was contracted by New Enterprise Stone & Lime to conduct preblast inspections and blast monitoring. The Sauls Seismic Now AccessSM system was utilized throughout the project to notify project management of vibration alerts. A combination text/email alert system was set up to send notifications for both alert and action levels of vibration.
Related Projects
-
Construction
Toyota Battery Manufacturing – Julian, NC
Project Details
- Project Name : Birmingham Central Business District Bridge Replacement – Birmingham, AL
Contact
- Sauls Seismic, LLC
2879 Alton Way Birmingham, Alabama USA 35210 - (866) 527-2477